Creative Plans for Building(s) up in Central SoMa
Plans to raze the through-block building at 470-474 Bryant Street, along with the adjacent, but much smaller, modern-looking building at 482 Bryant, are in the works. And as proposed by…
San Francisco real estate tips, trends and the local scoop: "Plug In" to SocketSite™
Plans to raze the through-block building at 470-474 Bryant Street, along with the adjacent, but much smaller, modern-looking building at 482 Bryant, are in the works. And as proposed by…
Having dropped to an all-time low of 3.15 percent two weeks ago, the average rate for a benchmark 30-year mortgage has since inched up 6 basis points (0.06 percentage points)…
The temporary moratorium on the eviction of tenants in San Francisco for the non-payment of rent from April through July, if formally documented as being due to the COVID-19 pandemic,…
As we first outlined earlier this year, plans for a 24-unit, market-rate development to rise along Diamond Street, between the intersection of Diamond Heights Boulevard and 29th Street, overlooking Noe…
Designed by Kennerly Architecture and built in 2004, the signature end unit of the three-unit building at 201-207 Guerrero Street, unit #203, features an open main floor with a double…
With the number of homes newly listed for sale in San Francisco having outpaced the number of purchase contracts that were inked for the eighth week in a row, there…
The growth and expansion of UCSF’s 107-acre Parnassus Heights Campus, which includes the 61-acre Mount Sutro Open Space Reserve, was limited to a total of 3.55 million square feet of…
San Francisco’s Planning Department has just completed their preliminary review of the proposed 8-story, 213-unit development to rise up to 85 feet in height upon the landmark Sloat Garden Center…
Having hit its pandemic driven nadir at the end of April, when pending home sales were down nearly 50 percent on a year-over-year basis in San Francisco, the pace of…
As we outlined earlier this year (and since further refined and newly rendered above): While originally expected to occur last year, the Environmental Impact Report (EIR) for the proposed 55-story…