Rebuilding in the Tendernob
Five years ago a fire ripped through the four-story Chatom Apartments building that had stood at 824 Hyde Street since 1915 and the damaged eight-unit structure was subsequently razed. Four…
San Francisco real estate tips, trends and the local scoop: "Plug In" to SocketSite™
Five years ago a fire ripped through the four-story Chatom Apartments building that had stood at 824 Hyde Street since 1915 and the damaged eight-unit structure was subsequently razed. Four…
Built for the Schweitzer Wholesale Meat Company in 1936, most recently occupied by Paige Glass, and currently available for rent with a two to three year term, plans to raze…
An amendment to San Francisco’s Redevelopment Plan for the Transbay District has been drafted and formally put forth for adoption in order to raise the height limit for Transbay Block…
Waylaid by a pair of lawsuits filed by a group of neighbors in the adjacent Four Seasons building at 765 Market Street, a settlement has been reached to allow Millennium…
The plans for a four-story Marina building, with 28 market-rate condos to rise upon the shuttered Chevron station site at the corner of Bay and Buchanan, are slated to be…
Originally approved for development over fifteen years ago, the plans for a 33-story Downtown Oakland tower to rise at 1640 Broadway, upon the current parking lot at the corner of…
Plans to demolish the two Dogpatch buildings on the northeast corner of Third and 19th Streets and construct two seven-story structures upon the 2177 Third Street/560 19th Street site, which…
Plans to convert the 36,000-square-foot garage at 1125 Mission Street, which is currently boarded up, into three floors of tech space have cleared their first hurdle and been granted an…
Speaking of former Central Freeway parcels and future Hayes Valley developments, the plans for a pair of modern five-story buildings to rise on Central Freeway Parcels M (350 Octavia) and…
Following three years of delays and three rounds of bidding, two rounds of which were rejected when every bid came in over-budget before even breaking ground, the contract to build…