Articles Recently Tagged: Arquitectonica

(27 posts)
Trinity Place Watch: Timing, Destruction, And Design

Trinity Place Watch: Timing, Destruction, And Design

With the 418-unit Phase Two of Trinity Place at 1190 Mission Street now scheduling move-ins for August, Trinity Plaza (the old Del Webb Townhouse motel) has been reduced to rubble and the site for Trinity Place’s 545-unit Phase Three along 8th Street is being prepared for construction. As we... Read More »

The Revised Design(s) And Timing For A Tower At 41 Tehama

The Revised Design(s) And Timing For A Tower At 41 Tehama

As we first reported a few weeks ago, the original plans for a 550-foot tower designed by SOM to rise at 41 Tehama have been shelved and Fritzi Realty is moving forward with new plans for a 342 foot tower designed by Arquitectonica to rise on the site. The... Read More »

Reaching Out For A 32-Story Residential Tower To Rise At 41 Tehama

Reaching Out For A 32-Story Residential Tower To Rise At 41 Tehama

The original plans for a 550-foot tower designed by SOM to rise at 41 Tehama have been shelved, but with the Transit Center District Plan having been adopted and the site successfully upzoned from 220 to 360 feet, Fritzi Realty is moving forward with new plans to build an... Read More »

Trinity Place Phase Two: Timing And Reality Check

Trinity Place Phase Two: Timing And Reality Check

As originally designed, approved, and rendered, the 22-story second phase of Trinity Place rising at 1190 Mission Street was to feature a glass and aluminum curtain wall wrapping around its base on the corner of 8th Street with a precast concrete exterior above. As a number of plugged-in readers... Read More »

Arquitectonica Designed 1998 Market Street Ready To Break Ground

Arquitectonica Designed 1998 Market Street Ready To Break Ground

Unanimously approved by the Planning Commission back in 2009, the plans for 115 condos to rise in an Arquitectonica designed development at 1998 Market Street have been dusted off and permits pulled with construction expected to begin within 30 days. Construction is slated to last for 18 months with... Read More »

The Arquitectonica Redesigned 201 Folsom Street Rendering Scoop

The Arquitectonica Redesigned 201 Folsom Street Rendering Scoop

Arquitectonica blows the 725 doors off the old Heller Manus design for Tishman Speyer’s development at 201 Folsom. And as promised, we have the rendering and design scoop. The 80 foot full-lot podium is gone, instead two podium buildings topped with park-like outdoor areas for residents rise on the... Read More »

(More) Political Wrangling Over The Development Of Trinity Plaza

(More) Political Wrangling Over The Development Of Trinity Plaza

For decades, developer Angelo Sangiacamo has been trying to re-develop a mid-market plot of land which currently houses the Trinity Plaza apartment building (which he converted from a motor lodge in 1977). Under his latest proposal, 360 outdated units would be razed and replaced with a modern 1,900 unit... Read More »