Growing Pains And Gouging For Electric Vehicles In Mission Bay
When Bosa built the Madrone down in Mission Bay, five electric vehicle (EV) charging stations with two plugs each were installed in the building’s garage for a total of ten…
San Francisco real estate tips, trends and the local scoop: "Plug In" to SocketSite™
When Bosa built the Madrone down in Mission Bay, five electric vehicle (EV) charging stations with two plugs each were installed in the building’s garage for a total of ten…
Last night’s celebratory meeting for buyers of condos over at Madrone in South Mission Bay took a turn for the worse when the topic of technology was raised. From a…
Blocks 5 and 11 down in Mission Bay have just changed hands for a combined $41.4 million according to the San Francisco Business Times. Entitled for 198 and 170 units…
The piles were driven for Radiance’s 318-unit Phase Two (“Radiance West”) back in 2008 before construction was suspended that July. Developer Nat Bosa first floated the idea of breaking Phase…
While Phase One of Bosa’s Radiance at Mission Bay was never designed to stand alone, it will for a while longer. With lenders requiring “at least two-thirds of the units…